64 terms you will meet in a bid, a contract and a building permit, each linked to the guide that explains it in full.

A

Acclimation
Letting wood flooring sit in the room, at normal living conditions, before installing it, so it adjusts to the humidity. Flooring manufacturers and the National Wood Flooring Association publish instructions, and the flooring maker's own instructions govern. More: Hardwood floors
AFCI (arc-fault circuit interrupter)
A breaker or outlet that detects dangerous arcing in a circuit and shuts it off. The National Electrical Code requires it in many living areas of a home; which rooms depend on the code edition your area adopted. More: Lighting and electrical updates
Allowance
A set amount written into a contract for something you have not chosen yet, such as tile, a faucet or light fixtures. If your pick costs more, you pay the difference; if it costs less, the difference should come off the price. Ask whether installation labor sits inside the allowance or on top of it. More: Change orders and payment schedules
Asbestos-containing material (ACM)
Building material that contains asbestos, which was used in many products and is often found in older homes: some floor tiles and mastics, joint compound, textured ceilings, pipe and duct wrap. You cannot identify it by looking; a lab test of a sample does. Disturbing it can release fibers. More: Lead paint and asbestos in older homes

B

Backer board
A rigid board, often cement-based, fastened to studs or a floor to take tile where moisture is expected. It resists water better than ordinary drywall, but it still needs a proper waterproofing layer in a shower. More: Bathroom remodel
Blocking
Short pieces of lumber fitted between studs or joists to give something solid to fasten to: grab bars, cabinets, TV mounts, heavy shelving. It has to go in before the drywall, so decide where it goes at rough-in. More: Trim, doors and wall finishes
Building permit
Written permission from the local building department to do regulated work, followed by inspections. What needs a permit differs by city and county, and your building department decides. Structural, electrical, plumbing and gas changes are the usual triggers. More: Permits for interior remodels

C

Change order
A written change to the contract that states what is added or removed, what it does to the price, and what it does to the schedule. Both sides sign it before the work happens. It covers your own changes of mind and surprises found behind the walls. More: Change orders and payment schedules
Containment
Plastic sheeting, taped seams, closed doors and sealed vents that keep dust in the work area. Dust control matters for any remodel; in a pre-1978 home the RRP rule spells out specific practices. More: Living through a remodel
Contingency
Money you hold back, separate from the bids, for what turns up once walls and floors are open. How much to hold is your decision, not a rule; older houses and bigger scopes call for more room. Quote check lets you try a number against your bids. More: Set a remodel budget
Cost basis
What you paid for your home plus the cost of improvements, used to work out gain when you sell. IRS Publication 523 says improvements, such as a kitchen modernization or new flooring, add to basis, while repairs generally do not. Keep receipts and contracts. More: Resale value and taxes
Cost-plus contract
A contract in which you pay the actual cost of labor and materials plus a fee or markup. It can suit work with many unknowns, but the final price is open. Ask for regular cost reports and for a cap or an agreed review point. More: Change orders and payment schedules
Countertop template
The measurement, made after the cabinets are set, from which the fabricator cuts the slab. Ordering a countertop before the cabinets are in place risks a poor fit, which is why the schedule leaves a gap between installing cabinets and installing counters. More: Cabinets and countertops
Curbless shower
A shower with no step at the entry; the floor slopes to the drain instead. It usually calls for changes to floor framing or the subfloor and careful waterproofing, so settle it early, before framing is closed. More: Shower and tub replacement
Cure time
The wait before a material has reached working strength or can take use: thinset and grout under tile, paint and floor finish, adhesives. Manufacturers state it on the data sheet. Rushing it is a common cause of failures. More: Tile floors

D

Dedicated circuit
A circuit that serves one appliance or purpose, such as a dishwasher, microwave or range, so it does not share its load with outlets and lights. Adding appliances in a remodel can mean adding circuits. More: Lighting and electrical updates
Draw schedule
The list of payments tied to finished stages of the job, instead of dates. A renovation lender uses the same idea: funds are released in draws after work is verified. Match your contractor's payment stages to what is actually complete. More: Change orders and payment schedules
Drywall
Panels of gypsum between sheets of paper, screwed to the framing to make wall and ceiling surfaces. The seams and screw heads are taped and covered with joint compound before paint. More: Drywall repair and texture

E

Egress window
A window sized and placed so a person can climb out of a room in a fire. The model code (IRC R310) calls these emergency escape and rescue openings and requires them in sleeping rooms and basements. The basement bedroom check compares your measurements to the code text. More: Basement moisture and egress
Engineered hardwood
Flooring with a real hardwood top layer over plywood or other layers. It is more stable than solid wood when humidity changes. How many times it can be sanded depends on the thickness of the top layer. More: Hardwood floors
Expansion gap
A small space left at the edges of a wood or floating floor so it can expand and contract with humidity and temperature. Baseboard or trim hides it. A floor that is pinned against the walls can buckle. More: Vinyl plank and laminate

F

Face frame
A solid wood frame on the front of a cabinet box, with doors that sit over or inside it. It is the traditional American cabinet style, and it takes a little of the opening for the frame. More: Cabinets and countertops
FHA 203(k) loan
A HUD-insured mortgage that rolls the purchase or refinance of a home and its repairs into one loan. Funds for the work are paid in draws. Under Mortgagee Letter 2026-06, a Limited 203(k) allows up to four draw requests per contractor. More: Financing a remodel
Finish carpentry
The visible woodwork installed after walls are finished: baseboard, door and window casing, interior doors, built-ins and stair parts. Rough carpentry, by contrast, is the framing that gets covered. More: Trim, doors and wall finishes
Fixed-price contract
A contract with one stated price for a defined scope of work. The price moves only through signed change orders, so the quality of the scope matters more than the total. More: Change orders and payment schedules
Floating floor
A floor whose planks lock together and rest on the underlayment, instead of being glued or nailed to the subfloor. Click-lock vinyl plank and laminate are the common types. It needs an expansion gap at the walls. More: Vinyl plank and laminate
Frameless cabinets
Cabinets with no face frame; the doors cover the whole front of the box. They give full access to the box opening. Cabinet lines differ in box thickness and hardware, so compare the specification and not just the style name. More: Cabinets and countertops

G

GFCI (ground-fault circuit interrupter)
An outlet or breaker that cuts power within a fraction of a second when current leaks to ground, as it would through a person. The National Electrical Code lists where it is required, including places such as bathrooms, kitchens and basements; the list grew over the editions, so the edition your area adopted matters. More: Lighting and electrical updates
Grout
The material packed between tiles after they are set. It can be cement-based or epoxy. Grout is not a waterproof layer by itself, which is why showers need a separate waterproofing system behind the tile. More: Tile floors

H

HELOC (home equity line of credit)
A revolving line of credit secured by your house. The interest can change over time. IRS Publication 936 says interest on a loan secured by your home is deductible only when the money is used to buy, build or substantially improve that home, and limits apply. More: Financing a remodel

I

In-situ relative humidity test
A moisture test of a concrete slab that places probes in drilled holes and reads the humidity inside the slab (ASTM F2170). Flooring makers often name the readings their products tolerate. Surface meters alone do not give that reading. More: Subfloor and moisture checks
IRC (International Residential Code)
The model code from the International Code Council for one- and two-family houses and townhouses up to three stories. States and local governments adopt a specific edition, often with amendments, so the rule that applies to your house is the one your jurisdiction adopted. More: Permits for interior remodels

J

Joint compound
The paste, also called mud, used to tape and cover drywall seams and fasteners. It is sanded smooth when dry. Older joint compound can contain asbestos, so a test comes before sanding it in an older home. More: Drywall repair and texture

L

Lead-based paint
Paint that contains lead. Homes built before 1978 may have it under later coats. Sanding, scraping, cutting and demolition can create lead dust, which is especially harmful to young children and pregnant women. More: Lead paint and asbestos in older homes
Lead-Safe Certified firm
A firm certified by EPA, or by a state that runs its own program, to do renovation work under the RRP rule. It must use certified renovators and follow lead-safe practices. Ask to see the firm's certification before work starts in a pre-1978 home. More: Lead paint and asbestos in older homes
Lien waiver
A signed document in which a contractor, subcontractor or supplier gives up the right to file a lien for the amount covered. A conditional waiver takes effect when the payment clears; an unconditional one applies to money already received. Some states prescribe the form. More: Change orders and payment schedules
Linear foot
A foot of length along a wall. Cabinet and countertop quotes are often given per linear foot. Check what the unit includes: boxes, doors, hardware, delivery, installation and finishing. More: Cabinets and countertops
Lippage
The difference in height between the edges of neighboring tiles. It comes from the flatness of the floor under the tile, the tile itself and the setting work. Tile standards set what is acceptable, so ask which one your contract uses. More: Tile floors
Load-bearing wall
A wall that carries weight from the roof, floor or walls above down to the foundation. You cannot tell from the surface; a builder or engineer has to read the framing. Opening one needs a beam, posts and temporary support. More: Open floor plan and moving walls
LVL (laminated veneer lumber)
An engineered beam made from thin layers of wood glued together. Beams that replace a wall are often LVLs, sized by an engineer or by the manufacturer's tables for the span and the load, and not swapped for ordinary lumber on a hunch. More: Open floor plan and moving walls

M

Mechanic's lien
A claim that someone who supplied labor or materials can record against a property when they are not paid. Depending on state law, it can attach to your house even when you paid the general contractor in full. Lien waivers collected with each payment are the usual defense. More: Change orders and payment schedules

N

Net clear opening
The open area left when an egress window is fully open, with the sash, hardware and any stops out of the way. It is smaller than the frame size printed on a window label, and it is the number the code looks at. More: Basement moisture and egress

P

Primer
The first coat, formulated to seal a surface, help paint stick or block stains. New drywall, patches, stains and big color changes are where a primer is most often called for. More: Interior painting
Punch list
The list of small unfinished or faulty items near the end of a job: a paint touch-up, a door that rubs, a missing cover plate. Agree in the contract how it is made, who fixes what, and how much payment waits until it is done. More: Change orders and payment schedules

R

Respirable crystalline silica
Very fine dust released when cutting, grinding or drilling materials that contain quartz, such as engineered stone, natural stone, concrete, tile and masonry. Breathing it over time can cause serious lung disease. OSHA's construction standard (29 CFR 1926.1153) requires employers to control worker exposure. More: Cabinets and countertops
Rough opening
The framed hole in a wall where a door or window will go. It is larger than the door or window itself, to leave room to set it plumb and level. Changing a door size means changing the rough opening. More: Trim, doors and wall finishes
Rough-in
The stage when supply and drain lines, wiring and ducts are run inside open walls and floors, before insulation and drywall cover them. Where a permit is required, inspectors usually look at the rough-in before the walls are closed. More: Remodel order of work
RRP rule (Renovation, Repair and Painting)
EPA's rule (40 CFR part 745, subpart E) for paid work that disturbs paint in homes built before 1978. It requires an EPA-certified firm, a certified renovator and lead-safe work practices. Minor work that disturbs 6 square feet or less of paint per room indoors, or 20 square feet or less outdoors, is exempt, but window replacement and demolition are not covered by that exemption. Fifteen states run the program themselves. More: Lead paint and asbestos in older homes

S

Scope of work
The written list of what the contractor will do, in what rooms, with which materials, and what is left out. Two bids can only be compared when they share one scope. Anything not in the scope is either excluded or arrives later as a change order. More: Choosing a contractor
Service panel
The main electrical panel, or breaker box, where power enters the house and is divided into circuits. A remodel that adds loads may need the panel's capacity checked by a licensed electrician. More: Lighting and electrical updates
Sheen
How shiny a paint is, from flat or matte through eggshell, satin and semi-gloss to gloss. Shinier paint wipes clean more easily and shows surface flaws more. Names are not standardized across brands. More: Interior painting
Shower pan
The sloped, waterproofed floor of a shower that carries water to the drain. It can be built on site or come as a prefabricated base. Leaks here show up late and are costly to find, so the pan is often tested with water before tile. More: Shower and tub replacement
Skim coat
A thin layer of joint compound spread over a whole wall to even out texture, patches or a rough surface. It takes more labor than a spot repair, and it is a line to look for in a bid. More: Drywall repair and texture
Structural engineer
A licensed engineer who calculates loads and sizes beams, posts and footings, and stamps drawings. A building department may ask for engineered drawings when a bearing wall is removed or a beam is added. More: Open floor plan and moving walls
Subfloor
The structural layer, usually plywood or oriented strand board, fastened to the floor joists. The finished floor goes over it, sometimes with an underlayment between. Flatness, stiffness and moisture of the subfloor decide how well the floor above performs. More: Subfloor and moisture checks

T

Tear-out
Demolition of the existing finishes, and sometimes framing: cabinets, flooring, drywall, tile. It is where old paint, asbestos-containing materials and hidden damage first come to light, so decide in advance who handles what is found. More: Remodel order of work
Thinset
Cement-based adhesive that bonds tile to the floor or wall beneath it. Different tile and substrates call for different thinset types; the tile and thinset manufacturers' data sheets say which. More: Tile floors
Trim
The finish pieces at the edges of surfaces: baseboard at the floor, casing around doors and windows, crown at the ceiling. Painted trim and stained trim are priced and finished differently. More: Trim, doors and wall finishes

U

Underlayment
A layer between the subfloor and the finished floor that gives cushion, sound control, moisture protection or a smoother surface. The right type depends on the flooring, so follow the flooring maker's installation instructions. More: Subfloor and moisture checks

V

Vapor retarder
A sheet or coating that slows moisture vapor passing through a floor, wall or ceiling. Where it belongs depends on climate and on how the assembly is built, so follow the manufacturer's instructions and your building department. More: Basement moisture and egress
VOC (volatile organic compound)
A chemical that evaporates from paint, sealants, adhesives and finishes. VOCs cause odor and can affect indoor air. Paint cans state VOC content, usually in grams per liter; low-VOC claims vary by product, so read the product data sheet. More: Interior painting

W

Waste factor
The extra material you order for cuts, pattern matching and mistakes, usually stated as a percentage of the floor or wall area. It depends on the layout and the material. The floor and tile order tool turns your area and waste percentage into boxes. More: Tile floors
Waterproofing membrane
A sheet or liquid-applied layer under the tile that keeps water from reaching the framing in a shower or tub surround. It is a separate step from setting tile and grouting, and it is hidden once the tile goes on, so ask to see it before tiling starts. More: Shower and tub replacement