Skip to content
RenovaOak

Quote check

Put your bids next to each other, with a contingency, and see which ones to ask about scope before you sign.

0 to 50. A planning choice; 10 is only the starting value.

Bids: fill in two to four. The sample numbers are made up; replace them with yours.
Lowest bid —
Median of your bids — The middle bid; with two bids, the midpoint.

Bid A

Price per square foot —
Total with contingency —
Compared with the lowest bid —
Compared with the median —

Bid B

Price per square foot —
Total with contingency —
Compared with the lowest bid —
Compared with the median —

Bid C

Price per square foot —
Total with contingency —
Compared with the lowest bid —
Compared with the median —
Find your state by ZIP code or by name

We use your ZIP only to find the state. Showing Texas for now.

Statewide price level Texas: 92 to 97.9
Price level 97.1 (U.S. = 100)
Contractor license No general state license; electricians, HVAC and plumbers are licensed
Contract rules Homestead jobs over $5,000: payments go into a construction account

Read the Texas page

How the comparison works

You give the size of the job and two to four bids, each a total price. For every bid the tool shows:

  • Price per unit: the bid divided by the job size, in the unit you chose.
  • Total with contingency: the bid times 1 plus your contingency percent.
  • Difference from the lowest bid and from the median: in dollars and as a percent, comparing the bids as quoted, before contingency. The median is the middle bid. With two bids it is the midpoint, so a wide gap puts both bids on the same footing.

The tool never states or estimates what a job should cost. It only compares the numbers you type in.

The 25% question

When a bid is more than 25% lower or more than 25% higher than the median of your bids, the tool asks you to ask the contractor what is not in that bid. This is a rule of thumb for asking questions. It is not a verdict on the bid or the contractor, and it is not a market price. A lower bid can leave out work that a higher bid includes, and the reverse can be true too. A written scope from each contractor is how you find out.

Worked example with made-up numbers

A 120 square foot job, a 10% contingency and three made-up bids. The median is $10,200.

Bid Price Per sq ft With 10% Versus lowest Versus median
Bid A $8,600 $71.67 $9,460 The lowest bid $1,600 less (15.69% lower than the median)
Bid B $10,200 $85.00 $11,220 $1,600 more Same as the median
Bid C $13,900 $115.83 $15,290 $5,300 more $3,700 more (36.27% higher than the median); the scope question applies

Contingency

A contingency is money set aside for what turns up once walls and floors are open. How much to set aside is a planning choice. The tool starts at 10% as a default and accepts 0% to 50%.

Some loan programs set their own number. For a Standard FHA 203(k) loan, HUD Handbook 4000.1 sets the contingency reserve as a percentage of the financeable repair and improvement costs:

  • Structure 30 years old or older: required, 10% minimum and 20% maximum. If the Work Write-Up shows the utilities are not operable, 15% minimum and 20% maximum.
  • Structure under 30 years old: no minimum and a 20% maximum, except where there is evidence of termite damage, when it is required at 10% minimum and 20% maximum.
  • Limited 203(k): a reserve is not mandated and may not exceed 20% of the financeable costs.

The borrower may provide the reserve funds. Those percentages belong to that program and its loans. They do not apply to a job you pay for another way, and other lenders set their own rules. Ask your lender.

Sources

  • HUD, FHA Single Family Housing Policy Handbook 4000.1, section II.A.8.a (203(k) Rehabilitation Mortgage Insurance Program), Standard 203(k) contingency reserve chart and the Limited 203(k) paragraph: hud.gov 4000.1hsgh.pdf. The copy read on November 20, 2026 carries the header "Effective Date: 09/14/2015, Last Revised: 08/14/2019". HUD updates the handbook by mortgagee letter, so check the current text.
  • HUD, Standard 203(k) Contingency Reserve Requirements (same figures): entp.hud.gov, read November 20, 2026.

Limits

  • The tool compares totals. It cannot see scope, materials, schedule, warranty, licensing or insurance. Ask each contractor for a written scope and compare those too.
  • The state facts under the tool are statewide. Some cities and counties add their own contractor, permit and code rules.
  • Your ZIP is used only to find the state, in your browser. The bids you type are not sent anywhere.