Shower and tub replacement: measure the opening, then open the wall
A swap looks like a one-day job. It turns into a wall, floor and plumbing job when the crew finds what the old tub was hiding.
By RenovaOak Editorial Team Updated 8 min read
- What it covers
- Tub or base, walls, valve
- Usual order
- Demo, plumb, wall, set
- Permit
- Often for plumbing
- Biggest unknown
- Rot behind the old tub
In short
Replacing a tub or shower comes in four shapes: tub for tub, tub to shower, shower base or pan replacement, and a full tile shower. A prefab unit is made to a size, so measure the opening, the drain position and the path it must travel through the house before you order. Rot behind the old surround is common enough that bids should say what happens if it is found. In a house built before 1978, old paint and adhesives may contain lead or asbestos, which affects the demolition.
Four jobs under one name
Tub for tub
The same size, the same drain and the same valve, if all fit. The simplest to plan and the easiest to compare in a bid.
Tub to shower
A base or pan replaces the tub. The drain, the floor and often the valve and wall change.
Shower base or pan
A new base in an existing stall. The walls may stay if they are sound and dry.
Full tile shower
A built-up floor, a waterproof layer, tile and a drain. Everything is made on site.
Refinishing and liners are narrower alternatives for a tub with a sound body and a worn surface. The coating products involve solvents and fumes: ask the refinisher for the safety data sheet and a ventilation plan. The whole room is in bathroom remodel; the outside of the house and the roof vent are outside this site's scope.
How to measure before you order
- Measure the alcove length along the back wall, the width, and the wall height. Measure at the top, middle and bottom, and write down the smallest.
- Mark where the drain is. Manufacturers define a left or right drain from a stated viewpoint, usually standing in the room and facing the tub. Read the maker's drawing, because the wrong hand cannot be changed after the unit is made.
- Measure the doors, hallway turns and stairs the unit must pass through. One-piece surrounds and cast-iron tubs may not fit and may need to be cut or assembled in place.
- Note the valve and the showerhead heights and which wall they are on. Replacing a valve means opening the wall behind it.
- Check whether the framing and the floor can carry the new unit, and where the studs are. Ask the installer to confirm the sizes in writing.
Tile for a tiled shower is counted by wall area, with a waste allowance for cuts. The floor and tile order calculator turns an area and a waste percentage into boxes. The bid comparison tool lines up bids side by side.
What drives the cost
- Type of job: a tub-for-tub swap touches the least; a tub-to-shower conversion changes the drain and the floor.
- Surround: prefab panels, a one-piece unit and a custom tile wall differ in materials and labor.
- The valve: changing it adds plumbing and wall work.
- Access: stairs, tight hallways and a bathroom on an upper floor change labor and the way the unit is brought in.
- Repairs: rotted framing, a soft subfloor and old pipes are extras unless the bid says otherwise.
No prices here. What drives remodel prices explains the pattern, and the resale math calculator lets you test a plan with your own numbers instead of borrowed averages.
What is behind the surface
A tub that leaks at the overflow, a cracked caulk line or a failed pan lets water into the wall and the floor for years. When the old unit comes out, the crew may find soft studs, a stained subfloor or mold. EPA's mold guide says to dry water-damaged materials within 24 to 48 hours, and that porous materials that have grown mold may need to be thrown away. Ask what the contractor does if the wood is soft: who decides, how it is priced, and how it is documented. Subfloor and moisture checks explains how to test a floor.
Older houses add two more concerns. EPA lists vinyl floor tile, the backing on sheet flooring, adhesives, and textured paint and patching compounds among materials that can contain asbestos, and fibers can be released when such material is disturbed during demolition or remodeling. Paint in a house built before 1978 may contain lead. Read lead paint and asbestos in older homes and have the materials tested before demolition.
Setting the unit, the waterproofing and the fixtures
The manufacturer's installation instructions decide how a tub or base is supported, leveled, fastened and sealed, and a warranty may depend on following them. Ask the installer to show the instructions for your model, and keep them with the contract. For a tiled shower, the floor must slope toward the drain and a waterproof layer must sit behind the tile: tile and grout alone are not that layer. Tile work follows installation standards from the Tile Council of North America (TCNA), whose handbook and ANSI installation specifications are listed on its site. Ask which standard and which waterproofing product the bid assumes, how long the layer cures before tile, and whether the shower is flood-tested.
Showerheads carrying EPA's WaterSense label use no more than 2.0 gallons per minute; the page gives 2.5 as the standard flow. Glass doors and panels are regulated as safety glazing in model codes, so look for the label on the glass.
Permits, code and who does the work
The model codes behind most local rules are the International Residential Code (IRC) and a model plumbing code, with the National Electrical Code (NEC) for wiring and lighting. Your state or city adopts a particular edition. Your building department decides what needs a permit. A like-for-like swap may not need one in some places, and a drain move, a new valve or a conversion often does. Codes set rules for shower valves that limit water temperature, and for receptacles and lights near water, so ask the plumber and the electrician. Permits for interior remodels covers the steps.
Plumbers and electricians are licensed in many states even when general remodelers are not: check your state page. Prefab tub swaps are within reach of an experienced do-it-yourselfer, but the drain connection, the valve and the waterproofing are the parts that leak, and a leak hides inside the wall.
Safety
EPA's Renovation, Repair and Painting rule (40 CFR part 745) covers paid work that disturbs paint in homes built before 1978: the firm must be certified and its workers trained in lead-safe practices. EPA says homeowners working on their own pre-1978 home are generally not covered, but the rule does apply to a rental or a flip. Its minor-work exclusion is limited to 6 square feet of painted surface or less per room, and it excludes window replacement and demolition of painted surfaces. Open-flame burning is prohibited, and so is high-speed sanding or grinding without a HEPA vacuum attachment.
Cutting tile or masonry creates respirable crystalline silica. OSHA's construction guide for employers expects handheld saws to feed water to the blade, and calls for respirators when they are used indoors. Cut outside or with a wet saw, keep the area closed off and shut off the power at the breaker before working near wiring. Cast-iron tubs are heavy: ask who removes the old one and how.
What to ask before you sign, and common mistakes
- Which of the four jobs is this bid, and what is excluded?
- Who measures, and who is responsible if the unit does not fit or the drain is on the wrong side?
- What happens if rot or mold is found, and how are the extra costs approved? See change orders.
- What goes behind the tile or panels, by brand and product, and whose instructions are followed?
- Who pulls the permit and who is the licensed plumber on the job?
- Which warranties apply, and who handles a leak after the job?
- Ordering a unit before the opening and the drain are measured twice.
- Closing the wall before the plumbing is tested for leaks.
- Skipping an access panel for the valve.
- Paying in full before the first week of use shows no leak. See change orders and payment schedules.
Common questions
Can I swap a tub for a walk-in shower?
Usually, yes. It changes the drain, the floor and often the valve, so it is a plumbing and permit question as well as a tile question. Ask the contractor what changes, and what the building department requires.
Is a prefab surround as good as tile?
They do different jobs. A prefab unit has few seams and is installed quickly. Tile is custom, with more labor and more steps to get right. Judge each bid by what goes behind the surface and how it is installed.
How do I know if there is rot behind my tub?
Look for soft or stained floors, loose tile, a musty smell and caulk that keeps failing. You only know for sure when the wall is opened, so ask the bidder how it handles that.
Do I need a permit to replace a tub?
It depends on the place and the work. A drain move, a new valve or a conversion often needs one. Your building department decides.
Sources
- EPA: A Brief Guide to Mold, Moisture and Your Home
- EPA WaterSense: Showerheads
- EPA: Learn about asbestos
- EPA: Lead Renovation, Repair and Painting Program
- eCFR: 40 CFR part 745, subpart E (sections 745.83 and 745.85)
- OSHA: Small Entity Compliance Guide for the Respirable Crystalline Silica Standard for Construction (OSHA 3902)
- Tile Council of North America (TCNA)
Checked November 19, 2026. Read: the EPA mold, showerhead, asbestos and lead pages, 40 CFR 745.83 and 745.85, the OSHA 3902 guide and the TCNA home page (its handbook and ANSI specifications were not opened). Not read: any tub, shower base or waterproofing manufacturer's installation instructions, and the IRC, NEC and plumbing code texts. So this page gives no slopes, support details, valve rules, cure times, code sections or prices; take them from the instructions of the product you buy and from your building department.
Keep reading
-
Remodel
Bathroom remodel
Refresh or gut, tile and waterproofing, the fan, permits, and what a bid has to say.
-
Remodel
Subfloor and moisture checks
Stiff, flat, sound and dry: what to check under the floor before new flooring, and what to ask.
-
Planning guide
Lead paint and asbestos in older homes
EPA's lead-safe rule, EPA's asbestos advice, and the testing and contract lines to settle before you open a wall.