Change orders and payment schedules: get every change in writing

What a change order is, why interior jobs produce them, how allowances work, and how to pay in a way that keeps the job honest.

By RenovaOak Editorial Team Updated 8 min read

Change order
Scope, price or schedule
Sign it
Before the work starts
Up front
Not the full amount
Final payment
After work, if satisfied
Illustration: a signed contract with a change order clipped to it, an open wall behind them and a short payment schedule beside a calendar
The contract sets the starting point. A change order records each move away from it.

In short

A change order is a written agreement, made after the main contract is signed, that changes the scope of work, the price, the schedule, or all three. Interior jobs produce them because the surprises are behind the surface: a soft subfloor, old wiring, asbestos or lead, a code fix the inspector asks for. A good one says what changed, why, what it does to the price and the finish date, and who signed it, before the work happens. On payments, the FTC's advice is short: do not pay the full amount up front, and do not make the final payment until the work is done and you are satisfied.

What a change order is

A change order is a document you and the contractor both sign after the main contract. It changes the agreed scope (what work is included), the price, the schedule, or any mix of them. It can add work, remove work, swap a material or move the finish date. You both know what changed, and what it costs in money and time, before the work is done.

The main contract matters here. The FTC says a contract should list start and completion dates and include any promises made in conversation about scope, labor and materials, with no blank spaces. The tighter that first document is, the fewer arguments you have about what counts as a change. See choosing a remodeling contractor.

A change order can also be a credit. If you will supply materials or do part of the work, write that into the scope at the start, because gaps in who does what breed extras.

Why interior jobs produce change orders

A bid for interior work is built on what the contractor can see. When floors and walls come off, conditions turn up that nobody priced. That does not mean the contractor is padding the job. Ask each bidder, in writing, what they assumed about what is behind the surface.

  • A wet or soft subfloor. It often shows only when the old floor comes up. Find the water source first, or the new floor sits on the same problem. See subfloor and moisture checks.
  • Old wiring or pipes. In the model International Residential Code (IRC), ordinary repairs never include adding to, altering, replacing or relocating wiring or piping that affects public health or general safety (section R105.2.2 of the 2021 edition), so this work usually means a permit and inspections. See lighting and electrical updates.
  • Asbestos or lead. The EPA says you generally cannot tell by looking whether a material contains asbestos, and that if you are planning a remodel you should consider an inspection by a trained, accredited professional. Federal law does not require accreditation for people who inspect or remove it in detached single-family homes, but some states and localities do, so ask for proof. EPA advises separate firms for assessment and removal. In a home built before 1978, the EPA lead rule requires a certified firm, using lead-safe work practices, for paid work that disturbs painted surfaces. Either finding can change scope, price and schedule at once. See lead paint and asbestos in older homes.
  • Code fixes found at inspection. The model IRC calls for a rough inspection of plumbing, mechanical, gas and electrical work before it is covered (R109.1.2), says work must not go past an inspection point without the building official's approval, and says parts that fail must be corrected (R109.4). Your building department decides, since cities and states adopt and amend the model. See permits for interior remodels.

A plain change-order checklist

Use this for every change. One page is enough.

  1. What changed. Describe the work in plain words and say where: which room, which wall, which fixture.
  2. Why. Say whether it is a hidden condition, a code correction, or your own request. Ask for photos of a hidden condition, or the inspector's note for a code fix.
  3. Price effect. State the amount added or credited, with labor and materials shown separately, and the new total contract price. Say how and when it is paid.
  4. Schedule effect. State the days added, or "no change", and the new completion date.
  5. Who signs. You and the contractor, with dates.
  6. Before work. It is signed before the extra work starts. If something urgent must be made safe first, ask for a written note the same day.

Keep each signed change order with the contract.

Allowances and contingency

An allowance is a number the contract carries for something you have not chosen yet, usually a finish: tile, a faucet, light fixtures, a countertop slab. The contractor prices the job with that number in it. When you choose, the real price replaces the allowance. If you pick something above it, the difference is a change order. If you pick below it, ask whether the difference comes back as a credit.

Worked example with made-up numbers. These are not prices, only arithmetic. The tile allowance is 10 per square foot of material, you choose a tile that costs 14 per square foot, and the floor is 60 square feet.

Made-up numbers: a finish allowance versus the tile you choose
ItemMathResult
Allowance in the contract10 × 60600
Tile you choose14 × 60840
Change order for the difference840 − 600240 added

Ask what the allowance covers: material only, or also delivery, tax and installation. Use the floor and tile order tool to work out area and boxes before you shop. Choose finishes early: a late choice can delay the schedule.

Contingency is a different idea. It is money held back for unknowns, the surprises in the previous section, rather than for a choice you have not made yet. This site gives no percentage, because the sources we read do not set one. Enter your own figure in the contingency field of the bid comparison tool, and see setting a remodel budget for where it fits.

Payment schedules: what the FTC says

The FTC's guidance on home improvement gives three rules for paying. Do not pay the full amount up front. Know that some states limit down payments. Never make the final payment until the work is done and you are satisfied. The FTC gives no figures for how many payments or what share each should be.

  • Ask for the schedule in writing. The FTC advises a written agreement even if your state does not require one. Ask each bidder to list every payment, its amount and the point at which it is due.
  • Check your state's limit. Rules differ, so look at your state's page under price by state and ask your state attorney general's consumer office.
  • Final payment comes last. Walk every room with the contract and change orders in hand. If the job was permitted, the model IRC puts the final inspection after the permitted work is complete (R109.1.6), so ask when it happens relative to the last payment.
  • Keep records. Keep the contract, every change order, receipts and messages. In a dispute, the FTC advises trying the contractor first, then a certified letter with return receipt, then the state attorney general or a local consumer protection office.

One more FTC rule can matter at signing. Under its Cooling-Off Rule, you generally have three business days to cancel certain sales made at your home or away from the seller's permanent place of business. Exceptions exist, and the FTC page does not say how it treats extras added later, so ask.

Liens, and the extra nobody wrote down

A lien is a legal claim against a property, and in some places people who work on a house or supply materials to it can file one if they are not paid. The rules differ by state, so RenovaOak does not state them. Before you sign, ask a real estate attorney or your state's consumer office: can a subcontractor or supplier file a claim against my house if my contractor does not pay them, and what written proof of payment can I ask for? RenovaOak is not a lawyer, and your state's law decides.

Now the everyday case. The crew lead says, "While we are in here, we should also move that outlet." It is easy to say yes. The FTC advises that promises made in conversation belong in the contract, and an extra is the same thing.

  1. Do not say no and do not say yes. Say: "I am open to it. Please write it up with the price and the days, and I will sign."
  2. Ask whether the work is truly needed, and what happens if you skip it.
  3. Wait for the paper before work on it begins. If it already happened, ask for a dated change order before the next payment.
  4. If the answer is "we will sort it out at the end," ask for the price now.

What to ask before you sign, and common mistakes

  1. "What did you assume about what is behind the floor and walls, and is it written down?"
  2. "If you find a hidden condition, how and how fast do you tell me?"
  3. "Which items are allowances, what does each cover, and what happens if I choose below one?"
  4. "What are the payment amounts, and when is each due?"
  5. "Who pulls the permit, and when are the inspections?"

Common mistakes: approving extras by nod, paying ahead of the work, leaving allowances undefined, choosing finishes late, paying cash with no receipt and skipping the final walk-through. Weigh a big change against resale math with your own numbers.

Common questions

Can my contractor charge for extra work I did not approve in writing?

It depends on your contract and your state's law, and RenovaOak cannot say. The FTC advises getting a written agreement and putting promises in the contract. Ask your state attorney general's consumer office or an attorney before you pay a disputed extra.

What is the difference between an allowance and a change order?

An allowance is a number the contract carries for a finish you have not chosen yet. A change order records a change to the contract after it is signed. If your choice costs more than the allowance, the difference is usually handled as a change order.

How much should the down payment be?

The FTC gives no figure. It says not to pay the full amount up front and notes that some states limit down payments. Check your state's rule, and ask each bidder to write the payment schedule.

Is it a warning sign if a contractor wants cash only?

Yes. The FTC lists paying everything up front or cash only among the signs of a home improvement scam. If you do pay cash, get a dated, signed receipt.

Do I have to pay for a change a building inspector requires?

Often the work has to be done for the permit to close, but who pays depends on the contract and on what was assumed in the bid. Ask for the inspector's note and put the price in a change order. Your building department decides what the code requires.

Sources

Checked November 20, 2026. The FTC pages on home improvement scams (dated July 2022) and the Cooling-Off Rule (dated September 2025), the EPA asbestos homeowner page and the EPA lead-safe renovation page were read. The ICC chapter 1 text of the 2021 IRC was read (ICC marks it a historical version); it is model code, and your state or city adopts and amends it. Not read: the text of the FTC rule itself (16 CFR part 429), any state's home-improvement contract, deposit or lien statute, any sample change-order form, and any source that sets a contingency percentage, so none is given here. Allowances are explained from the general idea only, with made-up numbers. Your building department, your state's attorney general and an attorney decide what applies to you.