Hardwood floors: what to decide before the boards arrive
Solid, engineered or refinish: how the job is measured, why moisture and the subfloor come first, and what a bid has to say.
By RenovaOak Editorial Team Updated 7 min read
- What it covers
- New boards or a refinish
- Measured by
- Square feet plus waste
- Permit
- Often none; ask the city
- Biggest unknown
- Moisture and subfloor
In short
A hardwood floor job is one of three things: new solid boards, new engineered boards, or refinishing a floor you already have. Wood moves as it takes on and gives off moisture, so the work stands or falls on the moisture readings and the subfloor under the boards, not on the species. Ask every bidder which installation guideline and which flooring-maker instructions the crew follows, and get the area and boxes figured before you order with the floor and tile order calculator.
What a hardwood floor job includes
Three different jobs get called a hardwood floor, and a bid should say which one it is.
- Solid hardwood: each board is wood all the way through. It is usually nailed or stapled to a wood subfloor, and it is site-finished or prefinished.
- Engineered hardwood: a real-wood top layer, called the wear layer, glued over layers of plywood or fiberboard. Makers allow more installation methods for it, such as gluing or floating, but each product's instructions list which ones.
- Refinishing: sanding the existing boards and applying new finish. It adds little new material, but it only works if the wear layer is thick enough to sand and the floor is sound.
None of these fixes a floor that is moving, squeaking or damp for a reason below it. If the subfloor is the problem, read subfloor and moisture checks before you pick a board.
How the job is measured and ordered
Flooring is priced and ordered by the square foot of floor. You order more than the room's area because boards are cut at walls, ends and doorways, and some boards are set aside for defects. How much extra is a call for the installer and the maker's instructions, and it grows with diagonal layouts and short rooms.
Worked example with made-up numbers. A room is 12 feet by 15 feet, which is 180 square feet. If the installer says to allow 10 percent waste, you order 180 × 1.10 = 198 square feet. If one carton covers 20 square feet, 198 ÷ 20 = 9.9, so you round up to 10 cartons. The 10 percent and the carton size here are invented to show the arithmetic; your numbers come from your installer and the carton label.
The floor and tile order calculator does this for you with your own area, waste and carton figures. Keep one extra carton or a few boards from the same lot after the job for later repairs, because a later lot may not match.
Moisture, acclimation and the subfloor
Wood swells when it takes on moisture and shrinks when it dries. That is why gaps open in dry winter air and boards cup after a spill or a damp slab. The National Wood Flooring Association (NWFA) publishes installation and moisture guidelines, including titles on moisture and wood, regional climate variations and a jobsite checklist. The USDA Forest Products Laboratory's Wood Handbook is the federal reference on how wood and moisture interact. Neither is a substitute for the instructions that come with your flooring, which state the limits for that product.
The routine most guidelines share, in plain words: bring the flooring into the house, let it adjust as the maker directs, measure the moisture in the boards and in the subfloor with a moisture meter, and compare the readings with the limits in the instructions. This page gives no moisture numbers because they differ by product, species and installation method. Read them off the maker's sheet and ask the installer to write the readings down.
- Over a wood subfloor: check for squeaks, loose panels, stains, soft spots and sags. A sagging or bouncy floor needs framing work before flooring.
- Over concrete: solid wood is usually not nailed or stapled to a slab directly. The maker's instructions say which products may go there, with which underlayment, and which slab moisture test is required.
- Over a crawl space: ground moisture below the floor can matter as much as a spill above it.
What may be under and around the old floor
Pulling up old flooring opens up what the last owners covered.
- Old resilient flooring and adhesive: EPA lists vinyl floor tiles, the backing on vinyl sheet flooring and adhesives among the places asbestos may be found. Asbestos is a risk when the material is disturbed or damaged, including during remodeling. Do not sand, scrape or tear out old tile, sheet vinyl or black adhesive until you know what it is. Lead paint and asbestos in older homes explains testing and what to ask for.
- Painted baseboards and trim: in a house built before 1978 the paint may contain lead. Under the EPA's Renovation, Repair and Painting (RRP) rule, paid work that disturbs painted surfaces in those homes needs a firm certified by EPA or an authorized state and certified renovators who follow lead-safe work practices. The rule's exception for minor work is 6 square feet or less of painted surface per room inside, and removing a painted component counts its whole surface. Jobs in the same room within 30 days count as one.
- Old finish on refinished floors: the finish, and any paint beneath it, can be lead-bearing in an old house. Ask the firm how it contains dust and what it does with sanding debris.
Ask the bidder to say in the bid who holds the lead-safe certification if the house is that old, and what happens if the floor, trim or adhesive tests positive.
Permits, code, DIY and safety
Replacing or refinishing flooring in place often needs no permit. Cutting into joists, adding a wall or changing stairs does. The model code in most places is the International Residential Code (IRC), adopted by states and cities in different editions with local amendments. Your building department decides what applies to your address, so ask before the crew starts.
Refinishing and nailing a first floor of boards are jobs some experienced do-it-yourselfers take on. A drum or orbital sander removes a lot of wood fast, and one pass in the wrong place leaves a mark you cannot fix. Dust and finish fumes are real hazards: ask what ventilation, dust control and respirator the crew uses, and keep children and pets out of the area. Water-based and oil-based finishes differ in odor and drying time, so ask for the product's data sheet before the first coat.
What drives the price and what to ask before you sign
Material and wear layer
Species, board width, grade and the thickness of an engineered wear layer change what you pay and how many refinishes the floor can take.
What is under it
Subfloor repair, leveling, underlayment and removal of old flooring are often separate lines.
Layout and finish
Diagonal or patterned layouts, stairs, transitions and a site-applied finish add labor and coats.
- Ask each bidder to name the product, the species and width, the installation method and the NWFA guideline or maker's instructions they follow.
- Ask who takes moisture readings, with what meter, and whether the readings go in writing before the first board is laid.
- Ask what is included for old-floor removal and disposal, subfloor repair, baseboards, transitions and moving furniture.
- Put an allowance and a change order rule in writing for rot, squeaks or leveling found after the old floor is up. Change orders explains the paper trail.
- Compare bids line by line in the bid comparison tool, and ask for the maker's warranty terms separately from the installer's.
Common mistakes: ordering before the moisture readings, skipping acclimation the maker calls for, installing before plaster and paint are dry, sanding a thin wear layer, and not keeping spare boards. If flooring is part of a larger remodel, tile floors and vinyl plank and laminate cover the other main choices.
Common questions
Solid or engineered hardwood?
It depends on the subfloor, the room and the installation method the maker allows. Solid is wood all the way through; engineered has a real-wood top layer over a layered core. Read the maker's instructions for the exact product and ask the installer which method fits your floor.
Can I refinish my floor?
Possibly, if the boards are sound and the wear layer is thick enough to sand. A flooring pro can check it. In a house built before 1978, ask about lead in old paint and finish before any sanding.
How long should flooring sit in the house before installation?
It depends on the product and the conditions. The maker's instructions state the acclimation they require, and the NWFA guidelines cover the practice in general. Ask the installer to follow the written instructions and to record moisture readings.
Do I need a permit for new flooring?
Often not for like-for-like flooring, but structural changes need one. Call your city or county building department with your scope.
Sources
- National Wood Flooring Association: Guidelines and publications
- National Wood Flooring Association: Technical standards
- EPA: Learn about asbestos
- EPA: Lead Renovation, Repair and Painting Program
- 40 CFR 745.83: Definitions for Subpart E (minor repair and maintenance activities)
Checked November 19, 2026. We read the NWFA pages that list its guidelines and standards, the EPA asbestos and RRP pages and the text of 40 CFR 745.83. The NWFA guidelines themselves are available to members only and the USDA Forest Products Laboratory's Wood Handbook did not load for this check, so this page gives no moisture limits, acclimation times or fastener spacing: read them in the manufacturer's installation instructions for your product.
Keep reading
-
Remodel
Subfloor and moisture checks
Stiff, flat, sound and dry: what to check under the floor before new flooring, and what to ask.
-
Remodel
Vinyl plank and laminate
Click-lock planks: how they differ, why flatness and the wall gap matter, and the warranty fine print.
-
Planning guide
Remodel order of work
The usual sequence from permit to punch list, which steps are fixed by code, and which vary.