Kitchen remodel: decide the scope before you pick finishes

Refresh, replace in place or change the layout: each is a different job, and the layout decides most of what happens behind the walls.

By RenovaOak Editorial Team Updated 8 min read

What it covers
Cabinets, counters, floor
Usual order
Demo, rough-in, finish
Permit
Often, if layout changes
Biggest unknown
What is behind the walls
Illustration: a kitchen floor plan with the sink, range and refrigerator marked and dotted lines for the plumbing and wiring behind them
Moving the sink, the range or the refrigerator moves the pipes, wires and vents behind them.

In short

A kitchen remodel is three different jobs sold under one name: a refresh (paint, hardware, counters, maybe new fronts), a replace in place (new cabinets and counters in the same footprint) and a layout change (moving the sink, range or walls). The more you move, the more plumbing, gas, wiring and ductwork the crew has to reopen. Decide the layout and pick the appliances before cabinets are ordered, because the cabinets are drawn around them. In a house built before 1978, paint rules apply to any paid crew, and older floor tile, adhesives and wall patching compounds can contain asbestos.

What a kitchen remodel includes

Ask every bidder which of three jobs they are pricing. A refresh keeps the cabinet boxes and may change the fronts, counters, backsplash, paint and lighting. A replace in place removes cabinets and counters and installs new ones on the same walls, with the sink, range and refrigerator staying where they are. A layout change moves any of those, or removes a wall, and is the job that opens floors and ceilings.

This page covers the room as a whole. The two biggest purchases have their own page: kitchen cabinets and countertops. Taking out a wall is a structural question, and open floor plans and moving walls explains it. Windows, exterior doors and the outside of the house are outside this site's scope.

How a kitchen is measured

Bids use a few different units, so ask for each in writing. Cabinets are counted by linear feet along the wall, or listed one by one with their sizes. Countertops are counted in square feet of top, plus the sink cutout, the edge profile and any backsplash. Flooring is counted by the area of the room less what the cabinets cover. The floor and tile order calculator turns an area and a waste percentage into boxes.

Appliances and fixtures usually arrive as an allowance: a set amount the contractor budgets for an item you choose later. If you pick something that costs more, the difference is yours, and the change should be written down before it is ordered. The bid comparison tool lines up several bids per square foot so an allowance in one bid does not hide inside the price of another.

What drives the cost

Layout

Moving the sink, range or refrigerator means new supply and drain lines, a new gas line or circuit, and often a new duct run.

Cabinet type

Stock, semi-custom and custom cabinets differ in sizes, options and lead time. Install labor depends on how many boxes and how many filler pieces.

Counter material

Material, thickness, edge and cutouts change both the price and who can fabricate it.

Hidden conditions

Rot under the sink, old wiring, out-of-level floors and wall damage are found after the demolition, not before.

Schedule

Custom cabinets and counters are made to measure after the room is ready, and a late item can idle every trade behind it.

We do not print dollar figures: no free official source exists for them, and your market, house and choices decide the answer. Collect your own written bids, and test the plan with your own numbers in the resale math calculator, which takes your cost, the value you expect it to add, the years you will stay and your interest. What drives remodel prices shows the rest of the picture.

What is behind the surface

  • Paint: in a house built before 1978, assume the old paint may contain lead until a test says otherwise.
  • Floors and walls: EPA lists vinyl floor tile, the backing on sheet flooring, adhesives, and textured paint and patching compounds on walls and ceilings among materials that can contain asbestos. Fibers can be released when such material is disturbed during demolition or remodeling. Testing by an accredited lab comes before demolition, not after.
  • Wiring and plumbing: a kitchen opened for new cabinets often reveals old splices, undersized circuits or worn shutoff valves. Ask whose cost it is when the crew finds them.
  • Water damage: a slow leak under the sink or behind the dishwasher soaks the floor and cabinet bases. EPA's mold guide says to dry wet materials within 24 to 48 hours, and that porous materials that have grown mold may need to be thrown away.
  • Subfloor: see subfloor and moisture checks before new flooring goes over a damaged or uneven base.

Read lead paint and asbestos in older homes before you sign, because the answer changes the schedule and the bid.

Permits and code

The model codes behind most local rules are the International Residential Code (IRC) for the building and the National Electrical Code (NEC, NFPA 70) for wiring. Your state or city adopts a particular edition, often with changes, so the edition in force where you live may be older than the newest one. Your building department decides what needs a permit and which edition applies.

Ask the department about three things. First, whether new or moved circuits, gas piping, plumbing or a changed wall need a permit and an inspection. Second, which protections the electrical code requires on kitchen circuits, such as ground-fault and arc-fault protection: these requirements have grown from one edition to the next, so do not assume the old kitchen's wiring is the pattern for the new one. Third, where the range hood must vent, because the hood maker's instructions and the local code both govern that. Permits for interior remodels covers the process.

Usual order of work

The sequence below is a trade convention, not a rule. Crews vary it to fit the job, so ask for your own schedule.

  1. Protect the house, then take out cabinets, counters and any flooring that is going.
  2. Open walls and floors for the new plumbing, gas, wiring and duct runs, then get the rough-in inspection if one is required.
  3. Close and finish the walls, then paint (the paint order calculator turns wall area, openings and coats into gallons).
  4. Install the floor and the cabinets. Counters are usually measured for fit after the cabinets are set, then made and installed.
  5. Hang the backsplash, set the sink and faucet, finish the wiring, then place the appliances and call for final inspection.

The full sequence for a whole house is in remodel order of work. If you stay home during the job, read living through a remodel.

Safety, do-it-yourself and licensed work

EPA's lead rule (40 CFR part 745, the Renovation, Repair and Painting rule) applies to paid work that disturbs paint in homes built before 1978: the firm must be certified and workers trained in lead-safe practices. EPA says homeowners working on their own pre-1978 home are generally not covered, but the rule does apply if you rent out all or part of the home or flip it. The rule's exclusion for minor work is limited to 6 square feet of painted surface or less per room inside, and it does not cover window replacement or demolition of painted surfaces. The rule bans open-flame burning of paint and sanding or grinding without a HEPA vacuum attachment. Do not dry-sand old kitchen paint, even on your own.

Cutting stone, tile or engineered stone slab creates respirable crystalline silica. OSHA's construction guide for employers calls for a saw with a water feed, and respirators indoors, for handheld power saws, and it also lists dust-collection requirements for grinders. OSHA and NIOSH have issued a hazard alert for countertop work. Ask where your counters will be cut and how the dust is controlled.

Painting, demolition of cabinets and installing a backsplash are tasks many homeowners do. Gas piping, panel work and new circuits are licensed work in most places, and some states license plumbing and electrical trades while leaving general remodeling unlicensed. Your state page tells you what applies.

What to ask before you sign, and common mistakes

  1. Which of the three jobs is this bid for, and what is not included?
  2. Who measures, who draws the layout, and when do I approve it in writing?
  3. Which items are allowances, and what happens if I pick something that costs more?
  4. Who pulls permits and schedules inspections?
  5. If the house was built before 1978, is the firm EPA lead-safe certified, and will the paint and floors be tested first?
  6. How is a change handled? See change orders: nothing extra should start without a signed note.
  7. What is the payment schedule, and does each payment follow finished work? Change orders and payment schedules goes through it.
  • Ordering cabinets before the appliances are chosen and their spec sheets are in hand.
  • Choosing finishes first and the layout last.
  • Treating a bid with a large allowance as a firm price.
  • Signing a contract at your own table in a hurry. The FTC's Cooling-Off Rule (16 CFR part 429) gives a right to cancel certain sales made at your home. Read the notice before you sign.

Common questions

Do I need a permit for a kitchen remodel?

Often, when you move or add circuits, gas or plumbing, or change a wall. A cosmetic refresh may not need one. Your building department decides, so call before work starts.

Should I choose cabinets or appliances first?

Appliances first, at least their model numbers and spec sheets. Cabinet openings, vent paths and electrical outlets are drawn around the appliances you will install.

How do I know if my kitchen has lead or asbestos?

You cannot tell by looking. In a house built before 1978, ask for testing by a qualified person before demolition. For asbestos, an accredited lab analyzes a sample. See the page on lead and asbestos in older homes.

Can I live in the house during a kitchen remodel?

Many people do. Plan for no running water at the sink for a stretch, dust in the house and a temporary place to cook. Ask the contractor for a day-by-day plan of when water, power and gas are off.

Sources

Checked November 19, 2026. Read in full or in the relevant part: the EPA lead, asbestos and mold pages, 40 CFR 745.83 and 745.85, the OSHA silica page and the OSHA 3902 guide. Not read: the text of the IRC and the NEC (ICC and NFPA do not give free access), so this page gives no code section numbers or thresholds; ask your building department. The FTC rule, 16 CFR part 429, is named from the rule's scope and its notice should be read before you sign. No prices are given on purpose.